As
a stockpile and trading company, PT GOBAL ENERGY INDONESIA has a cooperative
relationship with companies holding IUP OP and PKP2B in Kalimantan and
Sumatra
The processing plant and the land where the product is held have an office and are supported by skilled personnel.
For all sampling and analysis, we appoint representatives who
meet the requirements of the inspection body according to international
standards at the port of loading and disposal port. And this is usually done by
:
1. PT GEOSERVICES
2. PT SUCOFINDO
3. PT CARSURIN
4. PT ANINDYA WIRAPUTRA KONSULT
5. PT TRIYASA PIRSA UTAMA
6. PT ASIATRUST TECHNOVIMA QUALITY
7. PT CCIC
8. PT CCI
9. PT SGS INDONESIA
10. IOL INDONESIA
11. PT LEON
12. ETC
Production capacity can be adjusted to the needs and loading can
be through;
- KPP- Hasnur Jetty 03 20' 00" latitude and 144 33' 20 East
longitude
- Taboneo (Banjarmasin) anchorage
Hand
size: 03-04-00 S / 114-25-00 E
Panamax : 03-40-30 S / 114-26-00 E
Cape size : 03-04-00 S /114-25-00 E
- Tanjung pemancigan anchorage Position:
Lat
03-12-00 S / Long 11-21-40 E (max Draft 15M-19M)
Lat 03-12-00 S / Long 116-19-6 E (max Draft about18M)
- Satui anchorage
Position:
Lat
03-58-00 S / Long 155-31-05 E (max Draft 15M)
Lat
03-56-00 S / Long 155-31-05 E (max Draft about 12M)
No comments:
Post a Comment